NERC, the North American Electric Reliability Corporation, publishes seasonal reliability assessments. Its 2026-2027 Winter Reliability Assessment, dated November 2026, covers December to February. It weighs whether generation and transmission can meet projected winter peak demand and operating reserves. Parts of it follow, not the whole.
The assessment names three major trends. The first says growth in winter resource capacity has improved the overall reliability outlook. Demand is rising too, and data centers are part of why.
Demand That Keeps Climbing
Electricity demand continues to climb rapidly, the report says. It says the rise is driven by the expansion of data centers, large industrial loads, and broad electrification across end-use sectors. Of its 23 assessment areas, 21 are forecast to see higher peak demand this winter.
NERC's forecast of aggregated peak demand across all its areas is 21 GW higher than its forecast for last winter. That forecast rise is 2.6%. It surpasses the previous year's forecast gain of 20 GW.
These are forecasts, not measured peaks. A note to the chart that shows these figures explains the choice. Forecast values, rather than actual historical peak demand, give a weather-normalized view of load growth.
SERC-East is historically a summer-peaking area, the report says. It is increasingly seeing higher winter peak demand year over year. Continued load growth across the residential, commercial, industrial and large load sectors has impacted its load profile during early morning winter peaks.
Supply, and Where It Could Fall Short
The capacity of resources for the upcoming winter has also risen sharply, the report says. Batteries and natural-gas-fired generation added the most winter capacity.
Adequate resources are available across the bulk power system for normal winter peak-load conditions, it finds. More extreme winter conditions extending over a wide area could result in supply shortfalls in some assessment areas. Prolonged, wide-area cold snaps can drive sharp increases in electricity demand, it says. They can also threaten reliable generation and the fuel supply for gas-fired plants.
Demand Response and Backup Generation
More large loads, data centers, and large industrial and commercial end users are taking part in demand response programs, the report says. Demand response is a resource that can lower demand during periods of grid stress. For this winter it is up 1.9 GW, or 4.5%.
Those resources come with limits. They are mainly commercial and industrial loads with agreements to curtail use during specific conditions, the report says. The agreements are with load-serving entities. They are subject to contractual limits, such as annual call limits, designated seasons or duration caps. In PJM, MISO and some other areas, operators must declare an energy emergency before deploying some of them.
Additional demand-side relief during grid emergencies can come from data centers switching to on-site backup generation, the report says. That holds particularly under the US Department of Energy's emergency orders under Section 202(c) of the Federal Power Act. The report's key findings speak to balancing authorities in the United States with data centers and large loads. They may seek emergency authority from the department, it says. The authority would let them direct large load customers to use backup generators. The report calls that a last resort, to reduce demand and avoid energy shortfalls.
Data centers stand on both sides of this winter's balance: in the demand that climbs, and in the relief for an emergency.
What the Report Says of Texas
For Texas, the report says ERCOT expects to have sufficient operating reserves for the winter peak load hour. That holds under expected normal system conditions.
The report also says ERCOT identified a new operational risk in 2026, from large computational loads. When such loads are in similar areas of the grid and do not have the ability to ride through a voltage excursion, the report says, there is an increased risk that a large amount of megawatts could be lost because of a fault on the system.
ERCOT has put in voltage ride-through requirements for new large computational loads. They became effective on August 1, 2026.
Sources
- North American Electric Reliability Corporation (NERC). 2026-2027 Winter Reliability Assessment. November 2026 (printed on the cover, which also carries a stray 'May 2026' beneath it; the scout's search result gives NERC's release of 18 November 2026, not read at source). regulator