ERCOT says it has developed three mitigation plans for large load groups it identified, based on its quarterly stability assessment for the fourth quarter of 2026. None is active yet. The loads' consumption, ERCOT says, "has not yet reached a level" at which the plans become active.
The account is in an ERCOT deck dated September 17, 2026, QSA Results and Large Load IROL Mitigation Plans. Parts of the deck follow, not the whole.
Reliability Concern of Large Load Ride-Through
The concern starts with a fault on the system. Large computational loads without ride-through capability trip, or move their load to backup generation. The deck calls what follows "customer-initiated load reduction." In a large amount, it says, it causes high system frequency and overvoltage.
ERCOT puts a number on it. It found that 3,200 MW of load loss results in a frequency overshoot to 60.4 Hz, under certain system conditions. That frequency, the deck says, leads to potential cascading outages and frequency instability.
In each quarterly stability assessment, ERCOT assesses the ride-through of large loads. The assessment looks for trip groups. In each, a single voltage disturbance may cause more than 3,200 MW of load loss from large loads. IROLs and mitigation plans are developed for the trip groups it identifies, the deck says.
IROL Groups for 2026 Q4
ERCOT verified the approved capacity of the affected loads with TSPs, and modified the assessment's results and groups. Multiple large loads had less approved capacity than the assessment used. ERCOT combined five groups in North and Central Texas into two, NORTH_LL and CENTRAL_LL. One original group is now under 3,200 MW, the deck says, so loads found only in that group were removed from the groups. In West Texas, one group is not needed, based on the fourth-quarter results. Another, FARWEST_LL, is still needed for monitoring purposes, the deck says, but "unlikely to become active in the upcoming quarter."
The three groups' adjusted approved capacity is 5,465 MW for NORTH_LL, 5,240 MW for CENTRAL_LL and 4,198 MW for FARWEST_LL.
In West Texas, about 1,400 MW of FARWEST_LL's approved capacity is a single large computational load. It has not received approval to energize. That, the deck says, brings the total under 3,200 MW.
Current Consumption Levels and Load Share
The deck's table of current consumption gives each group's maximum simultaneous consumption. NORTH_LL's is 1,615 MW. CENTRAL_LL's is 1,560 MW. FARWEST_LL's is 1,035 MW.
The deck says several computational loads are energized with large approved capacity, but are consuming under 5 MW. It also notes energized loads "far behind ramp schedules." Based on TSP feedback, the deck says, load share ratios are based on actual consumption instead of approved capacity. ERCOT determined each load's maximum consumption over the last three months. It used telemetry when available, and state estimated values when telemetry was suspect. A load under 5 MW is assumed to be construction load only, and is not used in the load share calculations.
How a Plan Would Work
Each plan gives a "Not To Exceed" limit to each of the parties the deck names as TSPs and QSEs, based on its share. The 3,200 MW limit "may not be exceeded, even temporarily," the deck says. So ERCOT will control each group to 85% of it, or 2,720 MW. The limits are based on that number.
A plan is activated through an ERCOT instruction. ERCOT will activate one once a group's aggregate consumption reaches about 2,500 MW. Until a plan becomes active, the deck says, affected loads may continue to ramp up. Once it is active, the parties must keep their load at or below their limit. ERCOT says it will take action as necessary to keep the consumption of each group below the 3,200 MW limit.
The plans list all the large loads in each group. They "cannot be shared publicly," the deck says.
Additional Work Needed
The deck lists more work to do. ERCOT is to meet the affected QSEs, for large loads co-located with generation resources. They will not have access to the full plans, and redacted versions may need to be drafted. The list also includes creating telemetry points, developing operator procedures and updating the SOL methodology.
Sources
- ERCOT (Electric Reliability Council of Texas). QSA Results and Large Load IROL Mitigation Plans. 17 September 2026 (on its cover). grid operator